Lambruk Mulwala Data Centre Campus and Industrial Precinct

Making room for Mulwala to grow

We believe that community infrastructure is vital to creating a long-term pathway to growth and opportunities in regional areas.

Led by local landowners, backed by local capital and 100 per cent Australian-owned, our proposal for a staged data centre campus would not only bring new investment and local work to Mulwala, but also share the ongoing benefits within the community.

Planning is at an early stage. We want to hear from neighbours and the wider community while the layout is still taking shape.

Sign up to receive updates on the Project

Mulwala at a glance

Lake Mulwala lies to the east of town, with the railway and Defence land to the west. This geography shapes where Mulwala can grow. Federation Council has sought federal funding to extend water and sewerage to land north of the canal for new housing.

The proposed data centre would sit west of the railway, near Mulwala Business Park and existing electricity infrastructure. The proposal also makes room for future industry beside the business park, along Tocumwal and Savernake Roads.

Sources: Federation Council Local Strategic Planning Statement 2020-2040; The Border Mail, 17 January 2024.

Aerial view of the Project site and its neighbours Aerial photograph with the Project site outlined. The site is bounded by Lambruck Lane to the north, Tocumwal Road to the south-west and south, and Savernake Road to the east. The data centre campus land is on the western side, with indicative data halls. Land retained for the solar farm is on the eastern side, with future industry land along the southern and eastern edges. Defence land and the Mulwala Canal lie to the west and south-west, an operating solar farm to the north-east, the Mulwala township to the east, and the Mulwala Business Park and zone substation to the south. 1 2 3 4 Data centre campus land Land retained for the solar farm Future industry land Defence land (munitions facility) Operating solar farm Mulwala township Mulwala Business Park Zone substation Lambruck Lane Tocumwal Road Tocumwal Road Savernake Road Mulwala Canal

Swipe sideways to see the whole map.

Aerial imagery: Google Earth, © 2026 Google, Airbus. Boundaries and data hall positions are indicative and will change. Not a survey.
The wider area Aerial photograph of the wider area. The Project site is at the northern edge of Mulwala. Lake Mulwala lies east and south-east of the town, with Yarrawonga on the southern shore. Project site Mulwala Yarrawonga Lake Mulwala
The wider area. The dashed box is the map above.
  • Project site, 168 hectares
  • Data centre campus land, about 62 hectares
  • 1Data halls, built one at a time (indicative)
  • 4Possible fourth hall, needing its own approval
  • Future industry land, 27 hectares
  • Land retained for the solar farm, 61 hectares

What could the Project contribute to Mulwala?

  • Land for future industry beside Mulwala Business Park, subject to changes to local planning rules
  • Work for local trades and suppliers during construction, with demand for accommodation and other services
  • Ongoing specialist jobs once the campus is operating, with potential for training to help local people take up those roles
  • Community benefits that reflect local priorities. We intend to work with Federation Council on these arrangements and report publicly on what they deliver. These benefits would be additional to measures required to manage the Project's impacts.

We will publish job and investment estimates once Project studies are complete.

  • Site and campusThe site covers about 168ha, with about 62ha proposed for the data centre campus
  • Data hallsUp to three halls would be built one at a time, as electricity supply is confirmed for each stage
  • ElectricityThe completed three-hall campus would draw a maximum of 350MW from the grid
  • Future industrial landAbout 27ha (66 acres) is proposed beside Mulwala Business Park
  • CoolingWe propose to fill the cooling system with water from the landowner's bore and recirculate it through sealed pipes. No town water is proposed for cooling.

The Project
at a glance

Current progress

The Project is in the early stages of planning. We have begun discussions with Federation Council and neighbours. The current land use rules do not allow a data centre on this site, so those rules would need to change before the Project could be approved.

We intend to seek approval through the NSW State Significant Development (SSD) planning pathway. We will prepare an Environmental Impact Statement (EIS) explaining the Project's likely impacts and how we propose to manage them. The NSW planning department will place the application and EIS on public exhibition so anyone can review the proposal and make a submission. The department will consider those submissions in its assessment before making a decision about the Project.

How approval works

From now to a decision

The dates shown are our current targets. The NSW Department of Planning, Housing and Infrastructure sets the timing for its part of the assessment.

  1. Early conversationsNowHave your say
  2. Scoping reportDecember 2026 (target)
  3. Study requirements issuedSet by the Department
  4. Studies, design and community sessionsInto 2027Have your say
  5. EIS on public exhibitionMid-2027 (target)Formal submissions
  6. NSW Government decisionAfter exhibition

Why this site

We chose this site because it would place the campus close to existing electricity infrastructure and industrial land on the western side of the railway. Mulwala Business Park is nearby, an operating solar farm adjoins the site and Essential Energy's zone substation is about 390m to the south. The solar farm also has approval for a battery. Most homes are more than 1km from the nearest proposed data hall.

About the site

Your questions answered

Wondering about water, power, noise, traffic or jobs? Browse through our list of most frequently asked questions to find an answer to your query.

Read our FAQs

Our commitment

We are committed to reviewing and responding to all questions and feedback about the Project. As planning progresses, we will publish updates on the issues people raise and any changes we make in response. To ensure transparency throughout this process, where we cannot make a suggested change within the Project, we will explain why.

Have your say